5 Ton 5000kg Lever Electric Lifting Chain Hoist

5 Ton 5000kg Lever CZPT Lifting Chain CZPT

CZPT Wire Rope CZPT-Primary Structure:

Reducer, managing organizations, roller tools, hook products, couplings, flexible cable existing into the device and stopper.
Motor is with cone rotor motors, established the power and braking pressure in a single.
 

CZPT Wire Rope CZPT-Working Problems:

1.Altitude does not exceed 1000m
2.Ambient air temperature is -20 ° C ~ +40 ° C
3.Ambient air humidity is not a lot more than eighty five% (at twenty five ° C)
four.Electrical power: three-section AC, 380V, 50HZ. Motor terminal voltage fluctuation ±10%
5.The electrical hoist is usually mounted indoors. When setting up outdoor, a rain protect ought to be additional.
When the earlier mentioned environmental situations are not met, specific orders are produced according to non-common goods.

CZPT Chain CZPT-Introduction:

one.Shell:
Produced of mild aluminumalloy, the cooling fin is specifically designedto ensure swift heat dissipation with therate up to 40% and continuous support.The integral enclosed construction isapplicable to chemical plant and electroplated factory

two.Facet magnetic baking system:
atest designof magnetic orce generator, it makes it possible for instantbrake as soon as the electricity off.

three.Help body:
Consist of two sturdy steel plates

four.Transformer:
24V/36V/48V
Utilized to prohibit unexected accident,for case in point, CZPT leakage whilst raining.

5.Electromagnetic contractor:
Extended functioning existence.

6.Mechanical braker:
Twin braking systemto be saft and dependable.

seven.Chain:
Chinese Chain Or CZPTed FEC80 ultra warmth-treatable alloy aluminum, It can utilized in inadequate environments such as raining, sea h2o and chemical.

8.Reverse guarding gadget:
unique cable remedy defend manage wire system.

nine.Hook:
scorching forging with best strength,hard to break. The reduced hook is ensured by 360 diploma rotation with basic safety tongue piece.

10.Push button:
Watertight, lifght and sturdy.

CZPT Parameter

Design NCH
.five-01S 01-01S 01-02S 1.5-01S 02-01S 02-02S two.five-01S 03-01S 03-02S 03-03S 05-02S
Capacity(Ton) .5 one 1 1.five two two 2.five 3 3 three 5
Lifting pace(m/min) seven.2 six.eight three.6 eight.eight six.six 3.4 five.6 5.6 3.3 2.two two.eight
Motor Electricity(kw) one.one 1.5 1.one three three 1.5 three three 3 one.five three
Internet Excess weight(kg) 47 65 53 108 108 seventy three 115 115 131 eighty five 145
Design NCH
.5-01D 01-01D 01-02D one.5-01D 02-01D 02-02D two.five-01D 03-01D 03-02D 03-03D 05-02D
Ability(Ton) .five one one one.five 2 two two.5 three 3 three five
Lifting pace(m/min) 7.two/two.4 6.9/2.3 3.6/1.two eight.eight/two.9 six.6/2.two three.three/1.1 five.six/1.8 5.6/1.8 three.three/one.one 2.two/.eight two.8/.9
Motor Electricity(kw) 1.one/.37 one.8/.6 1.1/.37 three./one. 3./1. one.eight/.6 3./1. 3./one. three./1. 1.8/.six three./1.
Net Fat(kg) fifty four seventy five 60 128 128 83 135 one hundred thirty five 151 95 one hundred sixty five
Other Specification for Solitary and CZPT Pace CZPT Chain CZPT
Rotation speed(r/min) 1440
Insulation Quality F class
Touring speed(m/min) Slow: 11m/min & Quick: 21m/min
Electricity Provide three-Section 380v 50Hz
Control Voltage 24V 36V 48V
NO.of Load Chain 1 1 two one 1 2 one 1 2 3 two
Spec.of load Chain Φ6.3 Φ7.one Φ6.three Φ10. Φ10. Φ7.1 Φ11.2 Φ11.two Φ10. Φ7.one Φ11.2
I-Beam(mm) seventy five-125 seventy five-178 seventy five-178 82-178 82-178 82-178 one hundred-178 one hundred-178 a hundred-178 100-178 112-178

Drawing

5 Ton 5000kg Lever Electric Lifting Chain Hoist